Earth Systems Science · Module 2 · Station Lab

The Slope Stability Rig

HS-ESS2-1 HS-ESS2-2 4 stations ~45 minutes

A hillside stands for decades, then fails in seconds after rain that was not the heaviest of the year.

Phase 0 · The phenomenon

The storm that was not the biggest

The failed hillside and the month of rain before it. The tallest bar came first; the slope failed on the day marked in red.

A cross-section of a hillside with a curved scar near the top and a lobe of slumped soil and fallen trees spread across a road at its foot. An inset bar chart of daily rainfall over 30 days shows one 80 mm bar on day 6, a cluster of 12 to 22 mm bars on days 18 to 23, and a 45 mm bar on day 24 marked as the day of failure.

A road cut through a soil-covered hillside has stood for forty years. In one wet month it took an 80 mm downpour without moving a centimetre.

Eighteen days later, after a week of steady showers, a smaller storm of 45 mm arrived — and the slope let go, sending a tongue of mud and trees across the road in seconds.

Why would a hillside survive the biggest storm and fail in a smaller one? Every slope keeps a balance sheet of forces. In this lab you will build that balance one piece at a time.

Essential question

Why can a hillside survive the biggest storm of the year and then fail during a smaller one?

What this lab works toward

  • HS-ESS2-1Model how Earth's internal and surface processes, working at different sizes and speeds, build continents and ocean-floor features.
  • HS-ESS2-2Analyze data to show how one change to Earth's surface can trigger feedbacks that change other Earth systems.

Plain-English summaries. The course maps these performance expectations to this lab; the official wording is published at nextgenscience.org.

The stations

  1. Angle of ReposeAt what angle does a slope of dry, loose grains start to slide?
  2. Roots and CohesionHow much do roots and cohesion add to a slope's strength?
  3. Pore PressureHow does water in the soil change the balance of forces?
  4. Rain RecordWhy did the 45 mm storm trigger the failure when the 80 mm storm did not?

Each station runs the same loop: predict before you see any data, investigate the model and record runs, reveal what the measurements show, then explain the gap between your prediction and the result. A claim-evidence-reasoning checkpoint and an exit ticket close the lab.